GlasGrid® CG100


 

Designed for use in spot repairs on roadways, such as reinforcing concrete joints, major intermittent transverse cracks, construction joints on widenings, and joints on trench repairs.

Product Specifications:

Specification For Use in Asphalt Overlays

CG-100

Imperial*

Metric**

Tensile Strength
Based On Component Strand Strength

Test Method ASTM D 6637
Across Width
560 lbs/in.

Across Length
560 lbs/in.
Across Width
100 kN/m.

Across Length
100 kN/m.
Elongation at Break
Test method ASTM D 6637
Less than 3% Less than 3%
Melting Point
Test Method ASTM D 276
Greater than 425°F Greater than 218°C
Mass/Unit Area
Test Method D5261-92
14 oz/yd2 475 g/m2
Asphalt Retention 0.2 gal/yd2 0.9 l/m2
Roll Length† 197 ft. 60 m
Roll Width† 5 ft. 1.5 m
Roll Area† 109 yd2 90 m2
Grid Size 1 in x 1 in 25 mm x 25 mm
Material Fiberglass reinforcement with modified polymer coating and pressure sensitive adhesive backing bonded to a non-woven polypropylene specifically engineered for asphalt overlays.
* All imperial values are approximate.
** All metric values are nominal.
Product is sold by the Roll.

 

Technical Specifications:

C50/C100 Specs

Installation Procedures:

The following are general guidelines to ensure a successful installation of CG System. For each specific project, a construction engineer will provide exact specifications for installation.

Surface Preparations
    • As directed by an engineer, repair potholes, cracks greater than 6mm (1/4"), badly damaged or rough pavement that may require milling and the placement of a leveling course.
    • Pavement must be free of dirt, water, oil and other foreign materials. Broom or air clean the surface so it is clean and dust-free.
    • Apply tack coat uniformly over the prepared asphaltic concrete surface at a residual rate of 0.9 - 1.36 litres/m2 (0.2 - 0.3 gal/yd2) using a calibrated distributor truck, ensuring that the application rate remains constant. The tack shall contain a minimum of 70% solids.
    • The tack coat area must be a minimum of 75 mm (3'') wider than the CG System.

Road Surface Condition

    • The road must be dry. Do not install CG System during any precipitation.
    • The road surface temperature must be between 5°C* (40°F**) and 60°C* (140°F**). On asphalt surfaces less than 24 hours old, the surface temperature should be between 5°C* and 46°C* (40°F** and 110°F**).

CG Placement Method

    • Place the CG System while the tack coat is still tacky/broken. Use a mechanical placement tractor or place manually.
    • Keep the material flat and wrinkle free. Installation may require hand brooming. For sharp curves, cut edges and fold over in the direction of the placement of asphalt overlay.
    • Overlaps must be a minimum 25mm (1'') to ensure a continuous moisture barrier.

Paving Method

    • Pave with hot mix overlay.
    • Asphalt overlay must be a minimum of 50mm (2'') compacted thickness.
    • All of the CG System must be paved over on the day of placement.
Other Important Considerations for Best Results
    • Because glass is a skin irritant, we recommend that workers shall wear gloves
    • To cut CG System to desired length, lay it over ironworks, roll, and then cut using a sharp utility knife.
    • CG System must be applied so that the material lies flat on the road surface with no ripples. Providing sufficient tension during application will eliminate ripples.
    • Overlap all end roll joints 75-150 mm (3"-6"). Ensure that the overlaps are shingled in the direction of paving and that these overlaps also receive an application of tack.
    • Overlap side joints 25-50 mm (1"-2").
    • To maximize product performance, only construction and emergency vehicles shall be allowed to drive on the CG System.
    • The above directions are a brief guide to installation. For complete directions, consult with your distributor.

*All Metric values are nominal.
**All imperial values are approximate.